Watson Road over Cocheco River
GoodStrafford County, New Hampshire · 2.8 MI from Barrington T · Structure no. 006500790014000
- Built
- 1986
- 39 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 145 ft
- 2 main spans
- Daily traffic
- 2,901
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Watson Road over Cocheco River is a steel continuous stringer/multi-beam or girder carrying Watson Road over Cocheco River in Strafford County, New Hampshire. It was built in 1986, so it is 39 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,901 vehicles a day, roughly 4% of them trucks, projected to reach 4,293 by 2043. The structure is 145 ft (44.2 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Watson Road over Cocheco River built?
It was built in 1986, making it 39 years old in 2025.
What condition is Watson Road over Cocheco River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Watson Road over Cocheco River carry?
About 2,901 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Watson Road over Cocheco River?
The structure is 145 ft (44.2 m) long with a longest span of 70 ft (21.3 m) and a deck 31 ft wide.
Who owns Watson Road over Cocheco River?
It is owned by the City or Municipal Highway Agency.