Maplewood Avenue over North Mill Pond
PoorRockingham County, New Hampshire · 0.2 MI E JCT US 1 Bypass · Structure no. 021702310010300
- Built
- 1940
- 85 years old, rebuilt 1976
- Condition
- Poor
- inspected October 2024
- Type
- Culvert
- Masonry
- Length
- 25 ft
- 1 main span
- Daily traffic
- 5,829
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Maplewood Avenue over North Mill Pond is a masonry culvert carrying Maplewood Avenue over North Mill Pond in Rockingham County, New Hampshire. It was built in 1940 and reconstructed in 1976, so it is 85 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 5,829 vehicles a day, roughly 5% of them trucks, projected to reach 8,626 by 2043. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Maplewood Avenue over North Mill Pond built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1976.
What condition is Maplewood Avenue over North Mill Pond in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.
How much traffic does Maplewood Avenue over North Mill Pond carry?
About 5,829 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Maplewood Avenue over North Mill Pond?
The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m).
Who owns Maplewood Avenue over North Mill Pond?
It is owned by the City or Municipal Highway Agency.