US 4 Nh 16 SP Tpk over NB Ramp
GoodRockingham County, New Hampshire · N SP Tpk I-95 Interchange · Structure no. 021701990013900
- Built
- 1971
- 54 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 144 ft
- 1 main span
- Daily traffic
- 12,881
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
US 4 Nh 16 SP Tpk over NB Ramp is a steel stringer/multi-beam or girder carrying US 4 Nh 16 SP Tpk over NB Ramp in Rockingham County, New Hampshire. It was built in 1971, so it is 54 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,881 vehicles a day, roughly 8% of them trucks, projected to reach 19,063 by 2043. The structure is 144 ft (44 m) long and 45 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 4 Nh 16 SP Tpk over NB Ramp built?
It was built in 1971, making it 54 years old in 2025.
What condition is US 4 Nh 16 SP Tpk over NB Ramp in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does US 4 Nh 16 SP Tpk over NB Ramp carry?
About 12,881 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is US 4 Nh 16 SP Tpk over NB Ramp?
The structure is 144 ft (44 m) long with a longest span of 140 ft (42.7 m) and a deck 45 ft wide.
Who owns US 4 Nh 16 SP Tpk over NB Ramp?
It is owned by the State Toll Authority.