US Bridges

NH101 WB over NH125

Good

Rockingham County, New Hampshire · .41 MI N Brentwood Tl · Structure no. 007801090003800

Built
1996
29 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
108 ft
1 main span
Daily traffic
24,023
2023 count
Owner
State
State Highway Agency

About this bridge

NH101 WB over NH125 is a steel stringer/multi-beam or girder carrying NH101 WB over NH125 in Rockingham County, New Hampshire. It was built in 1996, so it is 29 years old, younger than the New Hampshire average of 56.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,023 vehicles a day, roughly 8% of them trucks, projected to reach 35,554 by 2043. The structure is 108 ft (32.9 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNH101 WB
CrossesNH125
Location.41 MI N Brentwood Tl
RouteState Highway 101
Coordinates43.02651, -71.07376
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating95.9 US tons
Inventory rating57.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length108 ft (32.9 m)
Longest span104 ft (31.7 m)
Deck width45 ft (13.6 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,023 (2023)
Projected traffic35,554 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$314,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was NH101 WB over NH125 built?

It was built in 1996, making it 29 years old in 2025.

What condition is NH101 WB over NH125 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does NH101 WB over NH125 carry?

About 24,023 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is NH101 WB over NH125?

The structure is 108 ft (32.9 m) long with a longest span of 104 ft (31.7 m) and a deck 45 ft wide.

Who owns NH101 WB over NH125?

It is owned by the State Highway Agency.