US Bridges

Nh 28 over Tributary G

Good

Rockingham County, New Hampshire · 200 S of Bradford ST · Structure no. 006300780009000

Built
2015
10 years old
Condition
Good
inspected September 2024
Type
Frame
Concrete
Length
22 ft
1 main span
Daily traffic
10,683
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Nh 28 over Tributary G is a concrete frame carrying Nh 28 over Tributary G in Rockingham County, New Hampshire. It was built in 2015, so it is 10 years old, younger than the New Hampshire average of 56.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,683 vehicles a day, projected to reach 15,810 by 2043. The structure is 22 ft (6.7 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNh 28
CrossesTributary G
Location200 S of Bradford ST
RouteCity Street 0
Coordinates42.87618, -71.30933
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating69.4 US tons
Inventory rating53.6 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length22 ft (6.7 m)
Longest span20 ft (6.1 m)
Deck width36 ft (11 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,683 (2023)
Projected traffic15,810 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$314,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Nh 28 over Tributary G built?

It was built in 2015, making it 10 years old in 2025.

What condition is Nh 28 over Tributary G in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Nh 28 over Tributary G carry?

About 10,683 vehicles per day (2023 count).

How long is Nh 28 over Tributary G?

The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m) and a deck 36 ft wide.

Who owns Nh 28 over Tributary G?

It is owned by the City or Municipal Highway Agency.