NH127 over Spillway Channel
FairMerrimack County, New Hampshire · 2.77 MI JCT US 202 · Structure no. 012900890011400
- Built
- 1961
- 64 years old, rebuilt 2009
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 276 ft
- 3 main spans
- Daily traffic
- 3,434
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
NH127 over Spillway Channel is a steel continuous stringer/multi-beam or girder carrying NH127 over Spillway Channel in Merrimack County, New Hampshire. It was built in 1961 and reconstructed in 2009, so it is 64 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,434 vehicles a day, roughly 4% of them trucks, projected to reach 5,082 by 2043. The structure is 276 ft (84.1 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NH127 over Spillway Channel built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 2009.
What condition is NH127 over Spillway Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does NH127 over Spillway Channel carry?
About 3,434 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is NH127 over Spillway Channel?
The structure is 276 ft (84.1 m) long with a longest span of 112 ft (34.1 m) and a deck 32 ft wide.
Who owns NH127 over Spillway Channel?
It is owned by the State Highway Agency.