On-Orbit Drive over Gardner-Joe English Stre
PoorPosted for loadHillsborough County, New Hampshire · 1.2 Miles from Main Gate. · Structure no. AFNHRNGF00243
- Built
- 1959
- 66 years old
- Condition
- Poor
- inspected September 2024
- Type
- Culvert
- Steel
- Length
- 28 ft
- 3 main spans
- Daily traffic
- 10
- 2014 count
- Owner
- Federal
- Air Force
About this bridge
On-Orbit Drive over Gardner-Joe English Stre is a steel culvert carrying On-Orbit Drive over Gardner-Joe English Stre in Hillsborough County, New Hampshire. It was built in 1959, so it is 66 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, projected to reach 15 by 2034. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was On-Orbit Drive over Gardner-Joe English Stre built?
It was built in 1959, making it 66 years old in 2025.
What condition is On-Orbit Drive over Gardner-Joe English Stre in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does On-Orbit Drive over Gardner-Joe English Stre carry?
About 10 vehicles per day (2014 count).
How long is On-Orbit Drive over Gardner-Joe English Stre?
The structure is 28 ft (8.5 m) long with a longest span of 6 ft (1.8 m).
Who owns On-Orbit Drive over Gardner-Joe English Stre?
It is owned by the Air Force.