US Bridges

Braemoor Woods RD over Spicket River Tributary

Good

Hillsborough County, New Hampshire · 4 Tenths Mil East Nh 28 · Structure no. 022801040007300

Built
2006
19 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
168 ft
3 main spans
Daily traffic
541
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Braemoor Woods RD over Spicket River Tributary is a concrete culvert carrying Braemoor Woods RD over Spicket River Tributary in Hillsborough County, New Hampshire. It was built in 2006, so it is 19 years old, younger than the New Hampshire average of 56.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 541 vehicles a day, roughly 1% of them trucks, projected to reach 800 by 2043. The structure is 168 ft (51.2 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBraemoor Woods RD
CrossesSpicket River Tributary
Location4 Tenths Mil East Nh 28
RouteCity Street 0
Coordinates42.77172, -71.21334
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating45.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length168 ft (51.2 m)
Longest span54 ft (16.5 m)
Deck width40 ft (12.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic541 (2023)
Projected traffic800 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$314,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Braemoor Woods RD over Spicket River Tributary built?

It was built in 2006, making it 19 years old in 2025.

What condition is Braemoor Woods RD over Spicket River Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Braemoor Woods RD over Spicket River Tributary carry?

About 541 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Braemoor Woods RD over Spicket River Tributary?

The structure is 168 ft (51.2 m) long with a longest span of 54 ft (16.5 m) and a deck 40 ft wide.

Who owns Braemoor Woods RD over Spicket River Tributary?

It is owned by the City or Municipal Highway Agency.