US 3 Fee Tpk NB over Nashua River
FairHillsborough County, New Hampshire · 0.3 MI from Nh 130 · Structure no. 017701010011800
- Built
- 1955
- 70 years old, rebuilt 1996
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 338 ft
- 4 main spans
- Daily traffic
- 73,979
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
US 3 Fee Tpk NB over Nashua River is a steel continuous stringer/multi-beam or girder carrying US 3 Fee Tpk NB over Nashua River in Hillsborough County, New Hampshire. It was built in 1955 and reconstructed in 1996, so it is 70 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 73,979 vehicles a day, roughly 8% of them trucks, projected to reach 109,488 by 2043. The structure is 338 ft (103 m) long and 100 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 3 Fee Tpk NB over Nashua River built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1996.
What condition is US 3 Fee Tpk NB over Nashua River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does US 3 Fee Tpk NB over Nashua River carry?
About 73,979 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is US 3 Fee Tpk NB over Nashua River?
The structure is 338 ft (103 m) long with a longest span of 90 ft (27.4 m) and a deck 100 ft wide.
Who owns US 3 Fee Tpk NB over Nashua River?
It is owned by the State Toll Authority.