US Bridges

Roadway over Zealand River

FairPosted for load

Grafton County, New Hampshire · Map 10 · Structure no. 092201000001003

Built
1935
90 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
51 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

Roadway over Zealand River is a steel stringer/multi-beam or girder carrying Roadway over Zealand River in Grafton County, New Hampshire. It was built in 1935, so it is 90 years old, older than the New Hampshire average of 56.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 50 vehicles a day, projected to reach 75 by 2005. The structure is 51 ft (15.5 m) long and 20 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesRoadway
CrossesZealand River
LocationMap 10
RouteFederal Lands Road 16
Coordinates44.25446, -71.5041
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating26.1 US tons
Inventory rating20 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length51 ft (15.5 m)
Longest span50 ft (15.2 m)
Deck width20 ft (6.1 m)
Roadway width19 ft (5.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2005
Trucks—
Lanes on structure2
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$260,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Roadway over Zealand River built?

It was built in 1935, making it 90 years old in 2025.

What condition is Roadway over Zealand River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Roadway over Zealand River carry?

About 50 vehicles per day (latest count).

How long is Roadway over Zealand River?

The structure is 51 ft (15.5 m) long with a longest span of 50 ft (15.2 m) and a deck 20 ft wide.

Who owns Roadway over Zealand River?

It is owned by the U.S. Forest Service.