US 2 over Connecticut River
GoodCoos County, New Hampshire · At Vermont State Line · Structure no. 014101120013000
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 408 ft
- 2 main spans
- Daily traffic
- 3,840
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 2 over Connecticut River is a steel continuous stringer/multi-beam or girder carrying US 2 over Connecticut River in Coos County, New Hampshire. It was built in 2020, so it is 5 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,840 vehicles a day, roughly 7% of them trucks, projected to reach 5,683 by 2043. The structure is 408 ft (124.4 m) long and 47 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 2 over Connecticut River built?
It was built in 2020, making it 5 years old in 2025.
What condition is US 2 over Connecticut River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does US 2 over Connecticut River carry?
About 3,840 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is US 2 over Connecticut River?
The structure is 408 ft (124.4 m) long with a longest span of 200 ft (61 m) and a deck 47 ft wide.
Who owns US 2 over Connecticut River?
It is owned by the State Highway Agency.