Meriden Hill Road over Lyman Brook
GoodCoos County, New Hampshire · 0.7 MI from US RTE 3 · Structure no. 005100540003200
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 56 ft
- 1 main span
- Daily traffic
- 78
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Meriden Hill Road over Lyman Brook is a steel stringer/multi-beam or girder carrying Meriden Hill Road over Lyman Brook in Coos County, New Hampshire. It was built in 2014, so it is 11 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 78 vehicles a day, projected to reach 115 by 2043. The structure is 56 ft (17.1 m) long and 25 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Meriden Hill Road over Lyman Brook built?
It was built in 2014, making it 11 years old in 2025.
What condition is Meriden Hill Road over Lyman Brook in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Meriden Hill Road over Lyman Brook carry?
About 78 vehicles per day (2023 count).
How long is Meriden Hill Road over Lyman Brook?
The structure is 56 ft (17.1 m) long with a longest span of 50 ft (15.2 m) and a deck 25 ft wide.
Who owns Meriden Hill Road over Lyman Brook?
It is owned by the City or Municipal Highway Agency.