New Road over Melvin River
FairCarroll County, New Hampshire · 0.8 MI from Nh RTE 109 · Structure no. 025901330007400
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected August 2023
- Type
- Frame
- Concrete
- Length
- 22 ft
- 1 main span
- Daily traffic
- 244
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
New Road over Melvin River is a concrete frame carrying New Road over Melvin River in Carroll County, New Hampshire. It was built in 1940, so it is 85 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 244 vehicles a day, roughly 4% of them trucks, projected to reach 361 by 2043. The structure is 22 ft (6.7 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Road over Melvin River built?
It was built in 1940, making it 85 years old in 2025.
What condition is New Road over Melvin River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does New Road over Melvin River carry?
About 244 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is New Road over Melvin River?
The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m) and a deck 24 ft wide.
Who owns New Road over Melvin River?
It is owned by the City or Municipal Highway Agency.