Tasker Hill Road over Pequawket Pond is a prestressed concrete slab carrying Tasker Hill Road over Pequawket Pond in Carroll County, New Hampshire. It was built in 2010, so it is 15 years old, younger than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 510 vehicles a day, roughly 4% of them trucks, projected to reach 754 by 2043. The structure is 34 ft (10.4 m) long and 34 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tasker Hill Road over Pequawket Pond built?
It was built in 2010, making it 15 years old in 2025.
What condition is Tasker Hill Road over Pequawket Pond in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Tasker Hill Road over Pequawket Pond carry?
About 510 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Tasker Hill Road over Pequawket Pond?
The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 34 ft wide.
Who owns Tasker Hill Road over Pequawket Pond?
It is owned by the City or Municipal Highway Agency.