Depot Road over Suncook River
FairBelknap County, New Hampshire · 0.07 MI FR Nh RTE 126 · Structure no. 001401260008700
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 37 ft
- 1 main span
- Daily traffic
- 96
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Depot Road over Suncook River is a steel stringer/multi-beam or girder carrying Depot Road over Suncook River in Belknap County, New Hampshire. It was built in 1950, so it is 75 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 96 vehicles a day, projected to reach 142 by 2043. The structure is 37 ft (11.3 m) long and 22 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Depot Road over Suncook River built?
It was built in 1950, making it 75 years old in 2025.
What condition is Depot Road over Suncook River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Depot Road over Suncook River carry?
About 96 vehicles per day (2023 count).
How long is Depot Road over Suncook River?
The structure is 37 ft (11.3 m) long with a longest span of 32 ft (9.8 m) and a deck 22 ft wide.
Who owns Depot Road over Suncook River?
It is owned by the City or Municipal Highway Agency.