US Bridges

Main St/Fas 3215 over Stream

Fair

Wayne County, Nebraska · Hoskins Main @ 1st · Structure no. M1245B0705

Built
1981
44 years old
Condition
Fair
inspected November 2022
Type
Slab
Concrete Continuous
Length
67 ft
3 main spans
Daily traffic
185
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Main St/Fas 3215 over Stream is a concrete continuous slab carrying Main St/Fas 3215 over Stream in Wayne County, Nebraska. It was built in 1981, so it is 44 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 185 vehicles a day, projected to reach 120 by 2042. The structure is 67 ft (20.4 m) long and 43 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesMain St/Fas 3215
CrossesStream
LocationHoskins Main @ 1st
RouteCity Street 3215
Coordinates42.1153, -97.3064
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating62.8 US tons
Inventory rating37.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length67 ft (20.4 m)
Longest span26 ft (7.9 m)
Deck width43 ft (13 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic185 (2011)
Projected traffic120 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Main St/Fas 3215 over Stream built?

It was built in 1981, making it 44 years old in 2025.

What condition is Main St/Fas 3215 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.

How much traffic does Main St/Fas 3215 over Stream carry?

About 185 vehicles per day (2011 count).

How long is Main St/Fas 3215 over Stream?

The structure is 67 ft (20.4 m) long with a longest span of 26 ft (7.9 m) and a deck 43 ft wide.

Who owns Main St/Fas 3215 over Stream?

It is owned by the City or Municipal Highway Agency.