860th Road over Dog Creek
FairClosed to trafficWayne County, Nebraska · 1N 2E of Carroll · Structure no. C009011030
- Built
- 1935
- 90 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 40 ft
- 1 main span
- Daily traffic
- 15
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
860th Road over Dog Creek is a wood or timber stringer/multi-beam or girder carrying 860th Road over Dog Creek in Wayne County, Nebraska. It was built in 1935, so it is 90 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.
It carries about 15 vehicles a day, projected to reach 25 by 2042. The structure is 40 ft (12.2 m) long and 19 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 860th Road over Dog Creek built?
It was built in 1935, making it 90 years old in 2025.
What condition is 860th Road over Dog Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does 860th Road over Dog Creek carry?
About 15 vehicles per day (2003 count).
How long is 860th Road over Dog Creek?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 19 ft wide.
Who owns 860th Road over Dog Creek?
It is owned by the County Highway Agency.