US Bridges

N 10th ST over Cameron Ditch

Good

Washington County, Nebraska · 0.5 N of Blair · Structure no. C008903310P

Built
2018
7 years old
Condition
Good
inspected August 2023
Type
Slab
Concrete Continuous
Length
135 ft
3 main spans
Daily traffic
550
2011 count
Owner
County
County Highway Agency

About this bridge

N 10th ST over Cameron Ditch is a concrete continuous slab carrying N 10th ST over Cameron Ditch in Washington County, Nebraska. It was built in 2018, so it is 7 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, projected to reach 550 by 2033. The structure is 135 ft (41.1 m) long and 30 ft wide. If it were closed, the detour would be 62.1 mi (100 km).

CarriesN 10th ST
CrossesCameron Ditch
Location0.5 N of Blair
RouteCounty Highway 3865
Coordinates41.565, -96.126
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.7 US tons
Inventory rating48.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length135 ft (41.1 m)
Longest span54 ft (16.5 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2011)
Projected traffic550 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed62.1 mi (100 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N 10th ST over Cameron Ditch built?

It was built in 2018, making it 7 years old in 2025.

What condition is N 10th ST over Cameron Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does N 10th ST over Cameron Ditch carry?

About 550 vehicles per day (2011 count).

How long is N 10th ST over Cameron Ditch?

The structure is 135 ft (41.1 m) long with a longest span of 54 ft (16.5 m) and a deck 30 ft wide.

Who owns N 10th ST over Cameron Ditch?

It is owned by the County Highway Agency.