US Bridges

FAS 2075 over Stream

Good

Sherman County, Nebraska · Wjct N58/N92 7N 7.6W · Structure no. C008200405

Built
1979
46 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
27 ft
2 main spans
Daily traffic
70
2022 count
Owner
County
County Highway Agency

About this bridge

FAS 2075 over Stream is a concrete culvert carrying FAS 2075 over Stream in Sherman County, Nebraska. It was built in 1979, so it is 46 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 70 vehicles a day, projected to reach 30 by 2042. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 49.7 mi (80 km).

CarriesFAS 2075
CrossesStream
LocationWjct N58/N92 7N 7.6W
RouteCounty Highway 2075
Coordinates41.3797, -99.1288
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.4 US tons
Inventory rating24.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length27 ft (8.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic70 (2022)
Projected traffic30 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed49.7 mi (80 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS 2075 over Stream built?

It was built in 1979, making it 46 years old in 2025.

What condition is FAS 2075 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does FAS 2075 over Stream carry?

About 70 vehicles per day (2022 count).

How long is FAS 2075 over Stream?

The structure is 27 ft (8.2 m) long with a longest span of 12 ft (3.7 m).

Who owns FAS 2075 over Stream?

It is owned by the County Highway Agency.