County Road 20 over Cedar Canyon Drain
FairScotts Bluff County, Nebraska · 2S 1W of Gering · Structure no. C007903910
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 141 ft
- 3 main spans
- Daily traffic
- 45
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 20 over Cedar Canyon Drain is a steel continuous stringer/multi-beam or girder carrying County Road 20 over Cedar Canyon Drain in Scotts Bluff County, Nebraska. It was built in 1950, so it is 75 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 45 vehicles a day, projected to reach 76 by 2033. The structure is 141 ft (43 m) long and 22 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 20 over Cedar Canyon Drain built?
It was built in 1950, making it 75 years old in 2025.
What condition is County Road 20 over Cedar Canyon Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County Road 20 over Cedar Canyon Drain carry?
About 45 vehicles per day (2003 count).
How long is County Road 20 over Cedar Canyon Drain?
The structure is 141 ft (43 m) long with a longest span of 70 ft (21.3 m) and a deck 22 ft wide.
Who owns County Road 20 over Cedar Canyon Drain?
It is owned by the County Highway Agency.