County Road 9 over Upper Clear Creek
GoodSaunders County, Nebraska · 3.4S 2W of Leshara · Structure no. C007824710
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected August 2022
- Type
- Culvert
- Concrete
- Length
- 32 ft
- 3 main spans
- Daily traffic
- 50
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 9 over Upper Clear Creek is a concrete culvert carrying County Road 9 over Upper Clear Creek in Saunders County, Nebraska. It was built in 2016, so it is 9 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, projected to reach 72 by 2033. The structure is 32 ft (9.7 m) long. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 9 over Upper Clear Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is County Road 9 over Upper Clear Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2022.
How much traffic does County Road 9 over Upper Clear Creek carry?
About 50 vehicles per day (2003 count).
How long is County Road 9 over Upper Clear Creek?
The structure is 32 ft (9.7 m) long with a longest span of 10 ft (3 m).
Who owns County Road 9 over Upper Clear Creek?
It is owned by the County Highway Agency.