US Bridges

Road 11 over Mosquito Creek

Good

Saunders County, Nebraska · JCT US77/N63 6.2E 4.6S · Structure no. C007804305

Built
2024
1 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
58 ft
4 main spans
Daily traffic
255
2011 count
Owner
County
County Highway Agency

About this bridge

Road 11 over Mosquito Creek is a concrete culvert carrying Road 11 over Mosquito Creek in Saunders County, Nebraska. It was built in 2024, so it is 1 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 255 vehicles a day, projected to reach 265 by 2033. The structure is 58 ft (17.7 m) long. If it were closed, the detour would be 18.6 mi (30 km).

CarriesRoad 11
CrossesMosquito Creek
LocationJCT US77/N63 6.2E 4.6S
RouteCounty Highway 3365
Coordinates41.0796, -96.5023
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.4 US tons
Inventory rating32 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length58 ft (17.7 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic255 (2011)
Projected traffic265 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Road 11 over Mosquito Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is Road 11 over Mosquito Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Road 11 over Mosquito Creek carry?

About 255 vehicles per day (2011 count).

How long is Road 11 over Mosquito Creek?

The structure is 58 ft (17.7 m) long with a longest span of 12 ft (3.7 m).

Who owns Road 11 over Mosquito Creek?

It is owned by the County Highway Agency.