US Bridges

Fairvew RD/COL7916 over I80

Good

Sarpy County, Nebraska · 1N Gretna Intrchg · Structure no. S080 43418

Built
2002
23 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
240 ft
2 main spans
Daily traffic
130
1998 count
Owner
State
State Highway Agency

About this bridge

Fairvew RD/COL7916 over I80 is a prestressed concrete continuous stringer/multi-beam or girder carrying Fairvew RD/COL7916 over I80 in Sarpy County, Nebraska. It was built in 2002, so it is 23 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 130 vehicles a day, projected to reach 130 by 2033. The structure is 240 ft (73.2 m) long and 32 ft wide. If it were closed, the detour would be 18.6 mi (30 km).

CarriesFairvew RD/COL7916
CrossesI80
Location1N Gretna Intrchg
RouteCounty Highway 7916
Coordinates41.1038, -96.2344
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45.2 US tons
Inventory rating26.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length240 ft (73.2 m)
Longest span119 ft (36.3 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic130 (1998)
Projected traffic130 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fairvew RD/COL7916 over I80 built?

It was built in 2002, making it 23 years old in 2025.

What condition is Fairvew RD/COL7916 over I80 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Fairvew RD/COL7916 over I80 carry?

About 130 vehicles per day (1998 count).

How long is Fairvew RD/COL7916 over I80?

The structure is 240 ft (73.2 m) long with a longest span of 119 ft (36.3 m) and a deck 32 ft wide.

Who owns Fairvew RD/COL7916 over I80?

It is owned by the State Highway Agency.