US Bridges

I80 over Western Sarpy Drain Dtch

Good

Sarpy County, Nebraska · 5S Gretna Interchg · Structure no. S080 42770R

Built
2007
18 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
250 ft
3 main spans
Daily traffic
51,220
2018 count
Owner
State
State Highway Agency

About this bridge

I80 over Western Sarpy Drain Dtch is a prestressed concrete continuous stringer/multi-beam or girder carrying I80 over Western Sarpy Drain Dtch in Sarpy County, Nebraska. It was built in 2007, so it is 18 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 51,220 vehicles a day, roughly 15% of them trucks, projected to reach 71,708 by 2038. The structure is 250 ft (76.2 m) long and 62 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesI80
CrossesWestern Sarpy Drain Dtch
Location5S Gretna Interchg
RouteInterstate 80
Coordinates41.0322, -96.2921
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.3 US tons
Inventory rating27.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length250 ft (76.2 m)
Longest span96 ft (29.3 m)
Deck width62 ft (19 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic51,220 (2018)
Projected traffic71,708 by 2038
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I80 over Western Sarpy Drain Dtch built?

It was built in 2007, making it 18 years old in 2025.

What condition is I80 over Western Sarpy Drain Dtch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does I80 over Western Sarpy Drain Dtch carry?

About 51,220 vehicles per day (2018 count), of which roughly 15% are trucks.

How long is I80 over Western Sarpy Drain Dtch?

The structure is 250 ft (76.2 m) long with a longest span of 96 ft (29.3 m) and a deck 62 ft wide.

Who owns I80 over Western Sarpy Drain Dtch?

It is owned by the State Highway Agency.