US Bridges

NB-US75 over FAU 5020/CHANDLER RD

Good

Sarpy County, Nebraska · JCT US75/CHANDLER RD · Structure no. S075 08495R

Built
1988
37 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
167 ft
3 main spans
Daily traffic
58,870
2018 count
Owner
State
State Highway Agency

About this bridge

NB-US75 over FAU 5020/CHANDLER RD is a steel continuous stringer/multi-beam or girder carrying NB-US75 over FAU 5020/CHANDLER RD in Sarpy County, Nebraska. It was built in 1988, so it is 37 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 58,870 vehicles a day, roughly 4% of them trucks, projected to reach 79,475 by 2038. The structure is 167 ft (50.9 m) long and 45 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesNB-US75
CrossesFAU 5020/CHANDLER RD
LocationJCT US75/CHANDLER RD
RouteU.S. Route 75
Coordinates41.1837, -95.9379
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.7 US tons
Inventory rating43 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length167 ft (50.9 m)
Longest span93 ft (28.3 m)
Deck width45 ft (13.7 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic58,870 (2018)
Projected traffic79,475 by 2038
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB-US75 over FAU 5020/CHANDLER RD built?

It was built in 1988, making it 37 years old in 2025.

What condition is NB-US75 over FAU 5020/CHANDLER RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does NB-US75 over FAU 5020/CHANDLER RD carry?

About 58,870 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is NB-US75 over FAU 5020/CHANDLER RD?

The structure is 167 ft (50.9 m) long with a longest span of 93 ft (28.3 m) and a deck 45 ft wide.

Who owns NB-US75 over FAU 5020/CHANDLER RD?

It is owned by the State Highway Agency.