US Bridges

Fairview Road over US-75

Good

Sarpy County, Nebraska · JCT US75/N370 2.5S .2W · Structure no. S075 07939

Built
1990
35 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
250 ft
2 main spans
Daily traffic
1,000
2003 count
Owner
State
State Highway Agency

About this bridge

Fairview Road over US-75 is a prestressed concrete stringer/multi-beam or girder carrying Fairview Road over US-75 in Sarpy County, Nebraska. It was built in 1990, so it is 35 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,550 by 2033. The structure is 250 ft (76.2 m) long and 47 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesFairview Road
CrossesUS-75
LocationJCT US75/N370 2.5S .2W
RouteCounty Highway 414
Coordinates41.1039, -95.9311
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.8 US tons
Inventory rating44.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length250 ft (76.2 m)
Longest span136 ft (41.5 m)
Deck width47 ft (14.2 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2003)
Projected traffic1,550 by 2033
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fairview Road over US-75 built?

It was built in 1990, making it 35 years old in 2025.

What condition is Fairview Road over US-75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Fairview Road over US-75 carry?

About 1,000 vehicles per day (2003 count), of which roughly 10% are trucks.

How long is Fairview Road over US-75?

The structure is 250 ft (76.2 m) long with a longest span of 136 ft (41.5 m) and a deck 47 ft wide.

Who owns Fairview Road over US-75?

It is owned by the State Highway Agency.