US Bridges

Platteview RD over Springfield Creek

Fair

Sarpy County, Nebraska · JCT N85/N370 3.7S 4.8W · Structure no. C007711640

Built
2003
22 years old
Condition
Fair
inspected November 2024
Type
Tee Beam
Prestressed Concrete
Length
106 ft
3 main spans
Daily traffic
5,545
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Platteview RD over Springfield Creek is a prestressed concrete tee beam carrying Platteview RD over Springfield Creek in Sarpy County, Nebraska. It was built in 2003, so it is 22 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,545 vehicles a day, projected to reach 5,550 by 2033. The structure is 106 ft (32.3 m) long and 48 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

CarriesPlatteview RD
CrossesSpringfield Creek
LocationJCT N85/N370 3.7S 4.8W
RouteCity Street 3770
Coordinates41.0891, -96.1352
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.4 US tons
Inventory rating47.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length106 ft (32.3 m)
Longest span36 ft (11 m)
Deck width48 ft (14.6 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,545 (2011)
Projected traffic5,550 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Platteview RD over Springfield Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is Platteview RD over Springfield Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Platteview RD over Springfield Creek carry?

About 5,545 vehicles per day (2011 count).

How long is Platteview RD over Springfield Creek?

The structure is 106 ft (32.3 m) long with a longest span of 36 ft (11 m) and a deck 48 ft wide.

Who owns Platteview RD over Springfield Creek?

It is owned by the City or Municipal Highway Agency.