County Road 4 over Trib. to Warm Slough
FairPosted for loadMerrick County, Nebraska · 3W .2S Chapman · Structure no. C006110710
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 33 ft
- 1 main span
- Daily traffic
- 30
- 2003 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 4 over Trib. to Warm Slough is a wood or timber stringer/multi-beam or girder carrying County Road 4 over Trib. to Warm Slough in Merrick County, Nebraska. It was built in 1968, so it is 57 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, projected to reach 51 by 2033. The structure is 33 ft (10.1 m) long and 22 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 4 over Trib. to Warm Slough built?
It was built in 1968, making it 57 years old in 2025.
What condition is County Road 4 over Trib. to Warm Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does County Road 4 over Trib. to Warm Slough carry?
About 30 vehicles per day (2003 count).
How long is County Road 4 over Trib. to Warm Slough?
The structure is 33 ft (10.1 m) long with a longest span of 31 ft (9.4 m) and a deck 22 ft wide.
Who owns County Road 4 over Trib. to Warm Slough?
It is owned by the County Highway Agency.