US Bridges

County Highway over Jeffery Canyon

Good

Lincoln County, Nebraska · .1W 8.5S of Brady · Structure no. C005629505P

Built
2005
20 years old
Condition
Good
inspected October 2021
Type
Stringer/Multi-beam or Girder
Steel
Length
35 ft
1 main span
Daily traffic
30
2003 count
Owner
County
County Highway Agency

About this bridge

County Highway over Jeffery Canyon is a steel stringer/multi-beam or girder carrying County Highway over Jeffery Canyon in Lincoln County, Nebraska. It was built in 2005, so it is 20 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, projected to reach 51 by 2033. The structure is 35 ft (10.7 m) long and 31 ft wide. If it were closed, the detour would be 217.5 mi (350 km).

CarriesCounty Highway
CrossesJeffery Canyon
Location.1W 8.5S of Brady
RouteCounty Highway 0P295
Coordinates40.8964, -100.3767
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.4 US tons
Inventory rating54 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span34 ft (10.4 m)
Deck width31 ft (9.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2003)
Projected traffic51 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed217.5 mi (350 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Highway over Jeffery Canyon built?

It was built in 2005, making it 20 years old in 2025.

What condition is County Highway over Jeffery Canyon in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does County Highway over Jeffery Canyon carry?

About 30 vehicles per day (2003 count).

How long is County Highway over Jeffery Canyon?

The structure is 35 ft (10.7 m) long with a longest span of 34 ft (10.4 m) and a deck 31 ft wide.

Who owns County Highway over Jeffery Canyon?

It is owned by the County Highway Agency.