K ST over 1st/J/7th/8th/BNSF/UPRR
FairLancaster County, Nebraska · Lincoln K ST @ J ST · Structure no. U142503430R
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 3,199 ft
- 40 main spans
- Daily traffic
- 9,514
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
K ST over 1st/J/7th/8th/BNSF/UPRR is a prestressed concrete stringer/multi-beam or girder carrying K ST over 1st/J/7th/8th/BNSF/UPRR in Lancaster County, Nebraska. It was built in 1987, so it is 38 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,514 vehicles a day, roughly 4% of them trucks, projected to reach 10,000 by 2039. The structure is 3,199 ft (975.1 m) long and 37 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was K ST over 1st/J/7th/8th/BNSF/UPRR built?
It was built in 1987, making it 38 years old in 2025.
What condition is K ST over 1st/J/7th/8th/BNSF/UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does K ST over 1st/J/7th/8th/BNSF/UPRR carry?
About 9,514 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is K ST over 1st/J/7th/8th/BNSF/UPRR?
The structure is 3,199 ft (975.1 m) long with a longest span of 120 ft (36.6 m) and a deck 37 ft wide.
Who owns K ST over 1st/J/7th/8th/BNSF/UPRR?
It is owned by the City or Municipal Highway Agency.