US Bridges

Saltillo RD over N2

Good

Lancaster County, Nebraska · Lincoln South Beltway · Structure no. S002 46594

Built
2021
4 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
324 ft
2 main spans
Daily traffic
510
2012 count
Owner
State
State Highway Agency

About this bridge

Saltillo RD over N2 is a prestressed concrete continuous stringer/multi-beam or girder carrying Saltillo RD over N2 in Lancaster County, Nebraska. It was built in 2021, so it is 4 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 510 vehicles a day, roughly 7% of them trucks, projected to reach 510 by 2042. The structure is 324 ft (98.9 m) long and 46 ft wide.

CarriesSaltillo RD
CrossesN2
LocationLincoln South Beltway
RouteCounty Highway 0
Coordinates40.69726, -96.58592
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54 US tons
Inventory rating41.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length324 ft (98.9 m)
Longest span160 ft (48.8 m)
Deck width46 ft (14.1 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic510 (2012)
Projected traffic510 by 2042
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Saltillo RD over N2 built?

It was built in 2021, making it 4 years old in 2025.

What condition is Saltillo RD over N2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Saltillo RD over N2 carry?

About 510 vehicles per day (2012 count), of which roughly 7% are trucks.

How long is Saltillo RD over N2?

The structure is 324 ft (98.9 m) long with a longest span of 160 ft (48.8 m) and a deck 46 ft wide.

Who owns Saltillo RD over N2?

It is owned by the State Highway Agency.