US Bridges

Jamaica Ave over N2

Good

Lancaster County, Nebraska · Lincoln South Beltway · Structure no. S002 46136

Built
2022
3 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
212 ft
2 main spans
Daily traffic
4,700
2022 count
Owner
State
State Highway Agency

About this bridge

Jamaica Ave over N2 is a prestressed concrete continuous stringer/multi-beam or girder carrying Jamaica Ave over N2 in Lancaster County, Nebraska. It was built in 2022, so it is 3 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,700 vehicles a day, roughly 6% of them trucks, projected to reach 6,100 by 2042. The structure is 212 ft (64.7 m) long and 43 ft wide.

CarriesJamaica Ave
CrossesN2
LocationLincoln South Beltway
RouteCounty Highway 0
Coordinates40.69112, -96.67186
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.1 US tons
Inventory rating40.8 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length212 ft (64.7 m)
Longest span105 ft (32 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,700 (2022)
Projected traffic6,100 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Jamaica Ave over N2 built?

It was built in 2022, making it 3 years old in 2025.

What condition is Jamaica Ave over N2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Jamaica Ave over N2 carry?

About 4,700 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is Jamaica Ave over N2?

The structure is 212 ft (64.7 m) long with a longest span of 105 ft (32 m) and a deck 43 ft wide.

Who owns Jamaica Ave over N2?

It is owned by the State Highway Agency.