US Bridges

Saltillo RD over Wagon Train CR Trib P37

Good

Lancaster County, Nebraska · JCT 84th/SALTILLO RD .1W · Structure no. C005515025

Built
2023
2 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
44 ft
3 main spans
Daily traffic
3,110
2014 count
Owner
County
County Highway Agency

About this bridge

Saltillo RD over Wagon Train CR Trib P37 is a concrete culvert carrying Saltillo RD over Wagon Train CR Trib P37 in Lancaster County, Nebraska. It was built in 2023, so it is 2 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,110 vehicles a day, projected to reach 5,287 by 2035. The structure is 44 ft (13.5 m) long. If it were closed, the detour would be 18.6 mi (30 km).

CarriesSaltillo RD
CrossesWagon Train CR Trib P37
LocationJCT 84th/SALTILLO RD .1W
RouteCounty Highway 3300
Coordinates40.69727, -96.60855
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating5 US tons
Inventory rating4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length44 ft (13.5 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,110 (2014)
Projected traffic5,287 by 2035
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Saltillo RD over Wagon Train CR Trib P37 built?

It was built in 2023, making it 2 years old in 2025.

What condition is Saltillo RD over Wagon Train CR Trib P37 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Saltillo RD over Wagon Train CR Trib P37 carry?

About 3,110 vehicles per day (2014 count).

How long is Saltillo RD over Wagon Train CR Trib P37?

The structure is 44 ft (13.5 m) long with a longest span of 14 ft (4.3 m).

Who owns Saltillo RD over Wagon Train CR Trib P37?

It is owned by the County Highway Agency.