Township Road over West Bow Creek Tributary
FairPosted for loadKnox County, Nebraska · 3.7E 2.7N of Bloomfield · Structure no. C005407710
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 25 ft
- 1 main span
- Daily traffic
- 10
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Township Road over West Bow Creek Tributary is a steel stringer/multi-beam or girder carrying Township Road over West Bow Creek Tributary in Knox County, Nebraska. It was built in 1970, so it is 55 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, roughly 5% of them trucks, projected to reach 13 by 2042. The structure is 25 ft (7.6 m) long and 20 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Township Road over West Bow Creek Tributary built?
It was built in 1970, making it 55 years old in 2025.
What condition is Township Road over West Bow Creek Tributary in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Township Road over West Bow Creek Tributary carry?
About 10 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Township Road over West Bow Creek Tributary?
The structure is 25 ft (7.6 m) long with a longest span of 24 ft (7.3 m) and a deck 20 ft wide.
Who owns Township Road over West Bow Creek Tributary?
It is owned by the County Highway Agency.