US Bridges

725 RD over Yankee Creek Trib

Good

Johnson County, Nebraska · 1 N of Crab Orchard · Structure no. C004902805

Built
2017
8 years old
Condition
Good
inspected October 2022
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
75
2003 count
Owner
County
County Highway Agency

About this bridge

725 RD over Yankee Creek Trib is a concrete culvert carrying 725 RD over Yankee Creek Trib in Johnson County, Nebraska. It was built in 2017, so it is 8 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 150 by 2033. The structure is 30 ft (9.2 m) long.

Carries725 RD
CrossesYankee Creek Trib
Location1 N of Crab Orchard
RouteCounty Highway 0
Coordinates40.335, -96.4149
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.3 US tons
Inventory rating36.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length30 ft (9.2 m)
Longest span15 ft (4.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2003)
Projected traffic150 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 725 RD over Yankee Creek Trib built?

It was built in 2017, making it 8 years old in 2025.

What condition is 725 RD over Yankee Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does 725 RD over Yankee Creek Trib carry?

About 75 vehicles per day (2003 count).

How long is 725 RD over Yankee Creek Trib?

The structure is 30 ft (9.2 m) long with a longest span of 15 ft (4.5 m).

Who owns 725 RD over Yankee Creek Trib?

It is owned by the County Highway Agency.