US Bridges

Yutan RD over Farwell Main Canal

Fair

Howard County, Nebraska · JCT N11/N92 9W 6N · Structure no. C004710330

Built
1963
62 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
77 ft
2 main spans
Daily traffic
35
2011 count
Owner
County
County Highway Agency

About this bridge

Yutan RD over Farwell Main Canal is a prestressed concrete stringer/multi-beam or girder carrying Yutan RD over Farwell Main Canal in Howard County, Nebraska. It was built in 1963, so it is 62 years old, older than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 35 vehicles a day, projected to reach 35 by 2033. The structure is 77 ft (23.5 m) long and 27 ft wide. If it were closed, the detour would be 18.6 mi (30 km).

CarriesYutan RD
CrossesFarwell Main Canal
LocationJCT N11/N92 9W 6N
RouteCounty Highway 2025
Coordinates41.3073, -98.7276
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.4 US tons
Inventory rating35.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length77 ft (23.5 m)
Longest span39 ft (11.9 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2011)
Projected traffic35 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Yutan RD over Farwell Main Canal built?

It was built in 1963, making it 62 years old in 2025.

What condition is Yutan RD over Farwell Main Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Yutan RD over Farwell Main Canal carry?

About 35 vehicles per day (2011 count).

How long is Yutan RD over Farwell Main Canal?

The structure is 77 ft (23.5 m) long with a longest span of 39 ft (11.9 m) and a deck 27 ft wide.

Who owns Yutan RD over Farwell Main Canal?

It is owned by the County Highway Agency.