US Bridges

Paul Street over Stream

Fair

Howard County, Nebraska · 1W ST Paul · Structure no. C004702625

Built
1939
86 years old, rebuilt 1999
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
48 ft
1 main span
Daily traffic
350
2003 count
Owner
County
County Highway Agency

About this bridge

Paul Street over Stream is a steel stringer/multi-beam or girder carrying Paul Street over Stream in Howard County, Nebraska. It was built in 1939 and reconstructed in 1999, so it is 86 years old, older than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 350 vehicles a day, roughly 10% of them trucks, projected to reach 490 by 2033. The structure is 48 ft (14.6 m) long and 24 ft wide. If it were closed, the detour would be 37.3 mi (60 km).

CarriesPaul Street
CrossesStream
Location1W ST Paul
RouteCounty Highway 26
Coordinates41.22, -98.4717
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating32 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length48 ft (14.6 m)
Longest span26 ft (7.9 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2003)
Projected traffic490 by 2033
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed37.3 mi (60 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Paul Street over Stream built?

It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1999.

What condition is Paul Street over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does Paul Street over Stream carry?

About 350 vehicles per day (2003 count), of which roughly 10% are trucks.

How long is Paul Street over Stream?

The structure is 48 ft (14.6 m) long with a longest span of 26 ft (7.9 m) and a deck 24 ft wide.

Who owns Paul Street over Stream?

It is owned by the County Highway Agency.