US Bridges

60th Rd/Fas 2255 over Silver Creek

Good

Hall County, Nebraska · JCT N2/N11 8.3E 3.1S · Structure no. C004012915

Built
1994
31 years old
Condition
Good
inspected February 2023
Type
Tee Beam
Prestressed Concrete
Length
66 ft
3 main spans
Daily traffic
145
2011 count
Owner
County
County Highway Agency

About this bridge

60th Rd/Fas 2255 over Silver Creek is a prestressed concrete tee beam carrying 60th Rd/Fas 2255 over Silver Creek in Hall County, Nebraska. It was built in 1994, so it is 31 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 145 vehicles a day, projected to reach 90 by 2033. The structure is 66 ft (20.1 m) long and 34 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

Carries60th Rd/Fas 2255
CrossesSilver Creek
LocationJCT N2/N11 8.3E 3.1S
RouteCounty Highway 2255
Coordinates40.9595, -98.4553
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.3 US tons
Inventory rating40.8 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length66 ft (20.1 m)
Longest span22 ft (6.7 m)
Deck width34 ft (10.5 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic145 (2011)
Projected traffic90 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 60th Rd/Fas 2255 over Silver Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is 60th Rd/Fas 2255 over Silver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does 60th Rd/Fas 2255 over Silver Creek carry?

About 145 vehicles per day (2011 count).

How long is 60th Rd/Fas 2255 over Silver Creek?

The structure is 66 ft (20.1 m) long with a longest span of 22 ft (6.7 m) and a deck 34 ft wide.

Who owns 60th Rd/Fas 2255 over Silver Creek?

It is owned by the County Highway Agency.