Main St/Fas 3285 over Stream
FairPosted for loadGage County, Nebraska · Adams Main @ 9th · Structure no. M0010C1005
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 41 ft
- 1 main span
- Daily traffic
- 865
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Main St/Fas 3285 over Stream is a steel stringer/multi-beam or girder carrying Main St/Fas 3285 over Stream in Gage County, Nebraska. It was built in 1961, so it is 64 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 865 vehicles a day, projected to reach 855 by 2033. The structure is 41 ft (12.5 m) long and 22 ft wide. If it were closed, the detour would be 12.4 mi (20 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main St/Fas 3285 over Stream built?
It was built in 1961, making it 64 years old in 2025.
What condition is Main St/Fas 3285 over Stream in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Main St/Fas 3285 over Stream carry?
About 865 vehicles per day (2011 count).
How long is Main St/Fas 3285 over Stream?
The structure is 41 ft (12.5 m) long with a longest span of 39 ft (11.9 m) and a deck 22 ft wide.
Who owns Main St/Fas 3285 over Stream?
It is owned by the City or Municipal Highway Agency.