Blondo St/Fau 5066 over Big Papillion Creek
GoodDouglas County, Nebraska · JCT I680/US6 1N .8W · Structure no. U182521825
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 218 ft
- 3 main spans
- Daily traffic
- 29,320
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Blondo St/Fau 5066 over Big Papillion Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Blondo St/Fau 5066 over Big Papillion Creek in Douglas County, Nebraska. It was built in 1999, so it is 26 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 29,320 vehicles a day, roughly 5% of them trucks, projected to reach 30,320 by 2033. The structure is 218 ft (66.4 m) long and 80 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Blondo St/Fau 5066 over Big Papillion Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is Blondo St/Fau 5066 over Big Papillion Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Blondo St/Fau 5066 over Big Papillion Creek carry?
About 29,320 vehicles per day (2013 count), of which roughly 5% are trucks.
How long is Blondo St/Fau 5066 over Big Papillion Creek?
The structure is 218 ft (66.4 m) long with a longest span of 72 ft (21.9 m) and a deck 80 ft wide.
Who owns Blondo St/Fau 5066 over Big Papillion Creek?
It is owned by the City or Municipal Highway Agency.