120th ST over Big Papillion Creek
GoodDouglas County, Nebraska · Omaha 120th @ W Maple · Structure no. U182513915
- Built
- 1980
- 45 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 203 ft
- 3 main spans
- Daily traffic
- 11,340
- 2013 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
120th ST over Big Papillion Creek is a steel continuous stringer/multi-beam or girder carrying 120th ST over Big Papillion Creek in Douglas County, Nebraska. It was built in 1980, so it is 45 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,340 vehicles a day, roughly 5% of them trucks, projected to reach 12,340 by 2033. The structure is 203 ft (61.9 m) long and 38 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 120th ST over Big Papillion Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is 120th ST over Big Papillion Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does 120th ST over Big Papillion Creek carry?
About 11,340 vehicles per day (2013 count), of which roughly 5% are trucks.
How long is 120th ST over Big Papillion Creek?
The structure is 203 ft (61.9 m) long with a longest span of 75 ft (22.9 m) and a deck 38 ft wide.
Who owns 120th ST over Big Papillion Creek?
It is owned by the City or Municipal Highway Agency.