US Bridges

WB-I80 to NB-680 over N38/WEST Center Road

Good

Douglas County, Nebraska · I680/N38 Intrchg · Structure no. S680 00083A

Built
1995
30 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
212 ft
3 main spans
Daily traffic
154,030
2018 count
Owner
State
State Highway Agency

About this bridge

WB-I80 to NB-680 over N38/WEST Center Road is a prestressed concrete continuous stringer/multi-beam or girder carrying WB-I80 to NB-680 over N38/WEST Center Road in Douglas County, Nebraska. It was built in 1995, so it is 30 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 154,030 vehicles a day, roughly 4% of them trucks, projected to reach 261,851 by 2038. The structure is 212 ft (64.6 m) long and 45 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesWB-I80 to NB-680
CrossesN38/WEST Center Road
LocationI680/N38 Intrchg
RouteInterstate 680
Coordinates41.2342, -96.0862
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.5 US tons
Inventory rating41.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length212 ft (64.6 m)
Longest span127 ft (38.7 m)
Deck width45 ft (13.6 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic154,030 (2018)
Projected traffic261,851 by 2038
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB-I80 to NB-680 over N38/WEST Center Road built?

It was built in 1995, making it 30 years old in 2025.

What condition is WB-I80 to NB-680 over N38/WEST Center Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does WB-I80 to NB-680 over N38/WEST Center Road carry?

About 154,030 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is WB-I80 to NB-680 over N38/WEST Center Road?

The structure is 212 ft (64.6 m) long with a longest span of 127 ft (38.7 m) and a deck 45 ft wide.

Who owns WB-I80 to NB-680 over N38/WEST Center Road?

It is owned by the State Highway Agency.