US Bridges

US75/CUMING ST Ext over Burt ST

Good

Douglas County, Nebraska · US75/BURT ST · Structure no. S075 09102A

Built
2005
20 years old, rebuilt 2021
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
126 ft
1 main span
Daily traffic
72,270
2018 count
Owner
State
State Highway Agency

About this bridge

US75/CUMING ST Ext over Burt ST is a prestressed concrete stringer/multi-beam or girder carrying US75/CUMING ST Ext over Burt ST in Douglas County, Nebraska. It was built in 2005 and reconstructed in 2021, so it is 20 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 72,270 vehicles a day, roughly 4% of them trucks, projected to reach 122,859 by 2038. The structure is 126 ft (38.4 m) long and 42 ft wide.

CarriesUS75/CUMING ST Ext
CrossesBurt ST
LocationUS75/BURT ST
RouteU.S. Route 75
Coordinates41.26689, -95.95184
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating105.8 US tons
Inventory rating65 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length126 ft (38.4 m)
Longest span124 ft (37.8 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic72,270 (2018)
Projected traffic122,859 by 2038
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US75/CUMING ST Ext over Burt ST built?

It was built in 2005, making it 20 years old in 2025. It was reconstructed in 2021.

What condition is US75/CUMING ST Ext over Burt ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does US75/CUMING ST Ext over Burt ST carry?

About 72,270 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is US75/CUMING ST Ext over Burt ST?

The structure is 126 ft (38.4 m) long with a longest span of 124 ft (37.8 m) and a deck 42 ft wide.

Who owns US75/CUMING ST Ext over Burt ST?

It is owned by the State Highway Agency.