US Bridges

Ramp to HWY 6 over Off Ramp

Good

Douglas County, Nebraska · Ramp 2 Wycliffe DR · Structure no. S006 36149A

Built
2018
7 years old
Condition
Good
inspected March 2024
Type
Slab
Concrete Continuous
Length
125 ft
3 main spans
Daily traffic
2,000
2011 count
Owner
State
State Highway Agency

About this bridge

Ramp to HWY 6 over Off Ramp is a concrete continuous slab carrying Ramp to HWY 6 over Off Ramp in Douglas County, Nebraska. It was built in 2018, so it is 7 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 5% of them trucks, projected to reach 3,000 by 2033. The structure is 125 ft (38.1 m) long and 30 ft wide.

CarriesRamp to HWY 6
CrossesOff Ramp
LocationRamp 2 Wycliffe DR
Coordinates41.2625, -96.1472
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.9 US tons
Inventory rating48.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length125 ft (38.1 m)
Longest span50 ft (15.2 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2011)
Projected traffic3,000 by 2033
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to HWY 6 over Off Ramp built?

It was built in 2018, making it 7 years old in 2025.

What condition is Ramp to HWY 6 over Off Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Ramp to HWY 6 over Off Ramp carry?

About 2,000 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is Ramp to HWY 6 over Off Ramp?

The structure is 125 ft (38.1 m) long with a longest span of 50 ft (15.2 m) and a deck 30 ft wide.

Who owns Ramp to HWY 6 over Off Ramp?

It is owned by the State Highway Agency.