US Bridges

Marinda Street over Boxelder Creek Trib

Good

Douglas County, Nebraska · 208 West of 208th ST · Structure no. C002820420

Built
2016
9 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
76 ft
1 main span
Daily traffic
100
2011 count
Owner
Private
Private (other than railroad)

About this bridge

Marinda Street over Boxelder Creek Trib is a prestressed concrete stringer/multi-beam or girder carrying Marinda Street over Boxelder Creek Trib in Douglas County, Nebraska. It was built in 2016, so it is 9 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 200 by 2033. The structure is 76 ft (23.2 m) long and 44 ft wide. If it were closed, the detour would be 18.6 mi (30 km).

CarriesMarinda Street
CrossesBoxelder Creek Trib
Location208 West of 208th ST
RouteCity Street 0
Coordinates41.237, -96.243
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating63.9 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length76 ft (23.2 m)
Longest span76 ft (23.2 m)
Deck width44 ft (13.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2011)
Projected traffic200 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marinda Street over Boxelder Creek Trib built?

It was built in 2016, making it 9 years old in 2025.

What condition is Marinda Street over Boxelder Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Marinda Street over Boxelder Creek Trib carry?

About 100 vehicles per day (2011 count).

How long is Marinda Street over Boxelder Creek Trib?

The structure is 76 ft (23.2 m) long with a longest span of 76 ft (23.2 m) and a deck 44 ft wide.

Who owns Marinda Street over Boxelder Creek Trib?

It is owned by the Private (other than railroad).