US Bridges

Township Road over Drainage Channel

Good

Dodge County, Nebraska · 1.3S 3.8E Fremont · Structure no. C002705105

Built
2000
25 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
22 ft
1 main span
Daily traffic
60
2004 count
Owner
County
County Highway Agency

About this bridge

Township Road over Drainage Channel is a steel stringer/multi-beam or girder carrying Township Road over Drainage Channel in Dodge County, Nebraska. It was built in 2000, so it is 25 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 20% of them trucks, projected to reach 102 by 2033. The structure is 22 ft (6.7 m) long and 29 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

CarriesTownship Road
CrossesDrainage Channel
Location1.3S 3.8E Fremont
RouteCounty Highway 51
Coordinates41.4147, -96.425
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating90.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length22 ft (6.7 m)
Longest span20 ft (6.1 m)
Deck width29 ft (8.7 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2004)
Projected traffic102 by 2033
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Township Road over Drainage Channel built?

It was built in 2000, making it 25 years old in 2025.

What condition is Township Road over Drainage Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Township Road over Drainage Channel carry?

About 60 vehicles per day (2004 count), of which roughly 20% are trucks.

How long is Township Road over Drainage Channel?

The structure is 22 ft (6.7 m) long with a longest span of 20 ft (6.1 m) and a deck 29 ft wide.

Who owns Township Road over Drainage Channel?

It is owned by the County Highway Agency.