US Bridges

Township Road over Central Cutoff Ditch

Good

Dodge County, Nebraska · Rd. 12 Bet. S & T · Structure no. C002702305

Built
1997
28 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
70 ft
1 main span
Daily traffic
85
2003 count
Owner
County
County Highway Agency

About this bridge

Township Road over Central Cutoff Ditch is a steel stringer/multi-beam or girder carrying Township Road over Central Cutoff Ditch in Dodge County, Nebraska. It was built in 1997, so it is 28 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 85 vehicles a day, projected to reach 144 by 2033. The structure is 70 ft (21.3 m) long and 29 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

CarriesTownship Road
CrossesCentral Cutoff Ditch
LocationRd. 12 Bet. S & T
RouteCounty Highway 23
Coordinates41.4667, -96.6933
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.4 US tons
Inventory rating27.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length70 ft (21.3 m)
Longest span68 ft (20.7 m)
Deck width29 ft (8.7 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic85 (2003)
Projected traffic144 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Township Road over Central Cutoff Ditch built?

It was built in 1997, making it 28 years old in 2025.

What condition is Township Road over Central Cutoff Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Township Road over Central Cutoff Ditch carry?

About 85 vehicles per day (2003 count).

How long is Township Road over Central Cutoff Ditch?

The structure is 70 ft (21.3 m) long with a longest span of 68 ft (20.7 m) and a deck 29 ft wide.

Who owns Township Road over Central Cutoff Ditch?

It is owned by the County Highway Agency.