US Bridges

US275 over Plum Creek

Good

Cuming County, Nebraska · 2NW West Point · Structure no. S275 11475R

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
202 ft
3 main spans
Daily traffic
5,640
2019 count
Owner
State
State Highway Agency

About this bridge

US275 over Plum Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying US275 over Plum Creek in Cuming County, Nebraska. It was built in 2023, so it is 2 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,640 vehicles a day, roughly 18% of them trucks, projected to reach 3,440 by 2039. The structure is 202 ft (61.6 m) long and 43 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

CarriesUS275
CrossesPlum Creek
Location2NW West Point
RouteU.S. Route 275
Coordinates41.87431, -96.72635
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.4 US tons
Inventory rating45.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3 (+2 approach)
Design loadHL 93
Structure length202 ft (61.6 m)
Longest span70 ft (21.3 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,640 (2019)
Projected traffic3,440 by 2039
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US275 over Plum Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is US275 over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does US275 over Plum Creek carry?

About 5,640 vehicles per day (2019 count), of which roughly 18% are trucks.

How long is US275 over Plum Creek?

The structure is 202 ft (61.6 m) long with a longest span of 70 ft (21.3 m) and a deck 43 ft wide.

Who owns US275 over Plum Creek?

It is owned by the State Highway Agency.