US Bridges

FAS 3185 over Sream

Fair

Cuming County, Nebraska · 8.7S .5E Wisner · Structure no. C002001130

Built
2004
21 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
30 ft
1 main span
Daily traffic
425
2011 count
Owner
County
County Highway Agency

About this bridge

FAS 3185 over Sream is a concrete stringer/multi-beam or girder carrying FAS 3185 over Sream in Cuming County, Nebraska. It was built in 2004, so it is 21 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 425 vehicles a day, projected to reach 330 by 2033. The structure is 30 ft (9.1 m) long and 29 ft wide. If it were closed, the detour would be 31.1 mi (50 km).

CarriesFAS 3185
CrossesSream
Location8.7S .5E Wisner
RouteCounty Highway 3185
Coordinates41.8617, -96.9222
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36.4 US tons
Inventory rating24.3 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span29 ft (8.8 m)
Deck width29 ft (8.7 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic425 (2011)
Projected traffic330 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed31.1 mi (50 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS 3185 over Sream built?

It was built in 2004, making it 21 years old in 2025.

What condition is FAS 3185 over Sream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does FAS 3185 over Sream carry?

About 425 vehicles per day (2011 count).

How long is FAS 3185 over Sream?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m) and a deck 29 ft wide.

Who owns FAS 3185 over Sream?

It is owned by the County Highway Agency.