US Bridges

Road V over East Fork Maple CR Trib

Good

Colfax County, Nebraska · 1.2S 2.2E of Howells · Structure no. C001910850

Built
2021
4 years old
Condition
Good
inspected November 2023
Type
Culvert
Steel
Length
30 ft
3 main spans
Daily traffic
40
2003 count
Owner
County
County Highway Agency

About this bridge

Road V over East Fork Maple CR Trib is a steel culvert carrying Road V over East Fork Maple CR Trib in Colfax County, Nebraska. It was built in 2021, so it is 4 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, projected to reach 68 by 2033. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 18.6 mi (30 km).

CarriesRoad V
CrossesEast Fork Maple CR Trib
Location1.2S 2.2E of Howells
RouteCounty Highway 108
Coordinates41.6992, -96.9592
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert9 ExcellentNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating47.4 US tons
Inventory rating36.4 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans3
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2003)
Projected traffic68 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Road V over East Fork Maple CR Trib built?

It was built in 2021, making it 4 years old in 2025.

What condition is Road V over East Fork Maple CR Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Road V over East Fork Maple CR Trib carry?

About 40 vehicles per day (2003 count).

How long is Road V over East Fork Maple CR Trib?

The structure is 30 ft (9.1 m) long with a longest span of 8 ft (2.4 m).

Who owns Road V over East Fork Maple CR Trib?

It is owned by the County Highway Agency.